Heavy Haulers see these machines arrive through Port of El Paso, TX from Mexico, Canada, and sometimes overseas units routed through Gulf or West Coast supply chains. Heavy Haulers plan for OEMs and dealer buyers moving John Deere, Tigercat, Komatsu, and Caterpillar forestry iron into the U.S. market. Heavy Haulers coordinate with different shipping lines, freight forwarders, and border brokers because this cargo does not come from one source or one schedule. Heavy Haulers know these units may be crated in parts, coated for corrosion, blocked and tied down on the vessel, then staged in bonded or secured yards after port-side inspection. Heavy Haulers work only after the machine clears the gate, because we do not load, unload, or handle customs. Heavy Haulers treat the pickup as a road move that starts with a careful condition check, measured dimensions, and a trailer match that fits the machine’s weight and stance. Heavy Haulers move these units with a plan, not guesswork.
Heavy Haul Transporting helps businesses coordinate the movement of oversized freight, industrial machinery, construction equipment, and project cargo throughout North America.
Forestry skidders and feller bunchers entering through Port of El Paso, TX often come from Mexico’s manufacturing and assembly corridors, along with Canadian-built machines and imported inventory routed through U.S. distributors. The buyer base is usually logging contractors, land-clearing firms, timber operators, and equipment dealers that need machines ready for regional work. Heavy Haul Transporting sees shipments arrive in mixed condition: some are fully assembled, others are partially disassembled for shipping, and many are protected with wrap, rust inhibitors, or blocking materials. Heavy Haulers coordinate road pickup only after release, when the unit is staged in a secured yard and the paperwork is clear. This border flow matters because the machine may have traveled through multiple carriers, terminals, and handoffs before it reaches us. Heavy Haulers understand that every extra transfer adds risk to tires, tracks, hydraulic components, and cab structure, so our pickup process starts with a close look at tie points and overall balance.
Demand for forestry skidders and feller bunchers stays tied to timber harvesting, wildfire mitigation, right-of-way clearing, and land development across the Southwest and beyond. These machines are not general freight; they are revenue tools that need to get back to work fast once they clear Port of El Paso, TX. Heavy Haulers see buyers move them into Texas, New Mexico, Arizona, Louisiana, and farther east where logging and clearing crews need dependable machine transport. Heavy Haul Transporting understands the economic side of each move: a delayed skidder can slow a crew, and a delayed feller buncher can idle an entire jobsite. That is why route timing, permit windows, and delivery planning matter. Our Team also watches seasonal demand, because wildfire response and forestry contracts can spike quickly. Heavy Haulers coordinate around those shifts with practical dispatching and direct over-the-road trucking. The goal is simple: keep the machine moving from border release to the next job without unnecessary downtime or extra handling.
| Highway | Transformer-Specific Notes | Key OD Notes |
|---|---|---|
| No highway data available. | ||
Forestry skidders and feller bunchers often ride on trailers built for weight, width, and ground clearance. We commonly match them with RGNs, lowboys, step decks, double drops, and multi-axle trailers depending on the machine’s track width, boom height, and overall center of gravity. Heavy Haul Transporting measures each unit before dispatch so the trailer sits right and the load stays within legal or permitted limits. Heavy Haulers know a feller buncher with a raised cab or cutting head can create height issues, while a skidder with wide tires or tracks can push width limits fast. That is why trailer selection is not generic. It depends on deck height, axle spread, and whether the machine needs ramps, winching, or extra blocking. Heavy Haulers also check tie-down points and suspension travel to reduce movement during long-haul trucking. For oversized loads, the wrong trailer choice can create permit problems or bridge clearance issues, so matching the trailer to the machine is part of the job from the start.
Texas oversize permits can change based on width, height, gross weight, and route conditions, so every move from Port of El Paso, TX needs a real plan. We review bridge clearances, road geometry, construction zones, and local restrictions before the truck rolls. Heavy Haulers coordinate route surveys when a machine is tall, wide, or heavy enough to trigger escort needs. In West Texas, that often means watching I-10, US-54, Loop 375, and connecting freight corridors near the border. Heavy Haul Transporting also checks turn radii, median crossings, and shoulder space because forestry equipment does not always travel like standard construction freight. Escort vehicles may be required for over-dimensional hauling, and timing can matter for daylight travel or restricted hours. Heavy Haulers handle these details with dispatch, permit review, and route selection that fits the actual load. The goal is to avoid surprises at overpasses, weigh stations, and tight city approaches after the machine leaves the port gate.
| Permit type | TxDOT Superload |
| Width trigger | Over 14 ft wide |
| Height trigger | Over 18 ft tall |
| Engineering study | Required over 16 ft wide |
| Processing time | 10–14 business days |
| FHWA notification | Required over 16 ft wide |
| Permit type | TxDOT Superload |
| Width trigger | Over 14 ft wide |
| Height trigger | Over 18 ft tall |
| Engineering study | Required over 16 ft wide |
| Processing time | 10–14 business days |
| FHWA notification | Required over 16 ft wide |
Heavy Haul Transporting provides over-the-road trucking only, moving forestry skidders and feller bunchers after they leave the port gate. We do not handle customs brokerage, warehousing, ocean freight, or terminal loading and unloading. Our Team focuses on the road segment, where planning, trailer selection, and driver experience matter most. Heavy Haulers manage pickup scheduling, permit timing, and direct dispatch across the United States for single machines or multiple units. Heavy Haul Transporting works with shippers, dealers, and receivers who need a machine moved from El Paso to a yard, shop, or jobsite without extra handoffs. We understand the difference between a short border move and a long haul trucking assignment that crosses several states. Heavy Haulers also prepare for weather, road work, and weight enforcement along the corridor. When the load is oversized, the truck, trailer, route, and escort plan all have to line up. That is the kind of road-only transport we handle every day.
China
View DetailsGermany
View DetailsIndia
View DetailsSouth Korea
View DetailsJapan
View DetailsNo. We only move the machine by road after it leaves the port gate and is released for pickup. We do not load, unload, or handle customs. Our job starts once the unit is staged and ready for over-the-road transport.
They commonly arrive from Mexico and Canada, with some units routed through U.S. import channels after overseas shipment. Buyers often include dealers, logging contractors, and land-clearing firms that need specific brands and configurations for regional work.
RGNs, lowboys, step decks, double drops, and multi-axle trailers are common choices. The right setup depends on machine height, width, weight, track spread, and ground clearance. We match the trailer to the load before dispatch.
Sometimes, yes. Escort needs depend on width, height, weight, and route conditions. We review permit rules, bridge clearances, and road restrictions before the move, then plan the route and timing around the actual dimensions of the machine.
Border-origin equipment may have already moved through several carriers and yards, so the final road move must protect the machine from extra handling. We check interstates, frontage roads, turns, and clearance points to reduce delays and avoid route conflicts.
We provide long-distance over-the-road trucking throughout the United States. That can mean regional Texas moves or multi-state hauls to logging, clearing, or dealer destinations. The route, trailer, and permit plan are built around the delivery point.
Have the release paperwork, exact dimensions, weight, pickup contact, and machine condition details ready. If the unit is staged in a secured yard, we can dispatch faster once the release is confirmed and the road plan is set.